Phase 2: Construction (1) |
![]() The north end of the house, before construction has started. The large conifer and ash tree is still there. |
![]() Construction has started. The ash has been moved and the conifer removed. |
![]() The trenches for the foundation have been dug, and the dirt is leveled in the center. |
![]() The forms for the foundation are being built. |
![]() Concrete has been poured into the forms and we wait for it to cure. |
![]() The forms around the cured foundation is removed. |
![]() Removal of the siding on the north wall has started. |
![]() The old gas meter needs to move. The pipe where the new meter will be connected is visible in the west wall. |
![]() The new gasmeter in place. |
![]() The floor joists and flooring is ready. |
![]() The walls are raised. |
![]() The framed outer walls in place. |
![]() The outer walls are enclosed. |
![]() The roof is added. |
![]() Shingles are placed on the roof and the outside walls are protected with a weather guard. |
![]() Siding is done and gutters are attached. Trim is painted. |
![]() The deck is being added. |