| Remodel 2007-2008 pictures |
| Return to main pictures |
Phase 2: Construction (2) |
![]() Inside the bedroom looking east. |
![]() The new master bathroom roughed in. |
![]() Insulation is added. |
![]() View of the Master bedroom after it is drywalled and painted |
![]() Master bathroom under construction |
![]() Master bathroom under construction |
![]() The walk-in closet |
![]() The entry way, the door opening has not yet been cut out |
![]() The entertainment system area |
![]() Can'twait to use that shower... |
![]() Little error in judgement of the cat. |
![]() The linnen closet in the walk-in closet. |
![]() New gutter. |
![]() Master bathroom cabinets. |
![]() Deck under construction |
Previous Next |